Caveat Lector: Although great care has been taken in the compilation of the information contained on this web site, the authors are not liable for the accuracy in terms of error or omission. The information on this web site is subject to change without notice and without obligation on the part of the authors. The authors shall not be liable for technical failures or for failures beyond their control. Some posts may contain authors' personal opinions and views and the authors do not represent any company, corporation or institution.

Monday, August 8, 2011

Factory Acceptance Test: Nantong Hyosung Transformer Co., Ltd. (Part 3)

We can only take pictures of the transformer for FAT but we are not allowed to take pictures of the five areas of EHV workshops (coiling area, insulation processing area, core processing area, active part assembly area, and final assembly area) including other products inside.
Below are some of the shots during testing of the power transformers:

Factory Acceptance Test: Nantong Hyosung Transformer Co., Ltd. (Part 2)

The continuation of my report is summarized below:

B) Spare parts for the their products are readily available from Nantong Hyosung. They can deliver spare parts, including bushings, one month after the order has been placed.
C) The company usually give 12-month warranty of their product after energization or 18 months after delivery, whichever comes first.
D) Nantong Hyosung Tansformer Co. Ltd. can provide financing to the buyers of their products.
E)  We took a tour on transformer manufacture, testing and inspection after the presentation.
-Among their equipments include horizontal and vertical winding machines, slitting lines for silicon steel sheets, core binding machine, air-cushioned vehicle, 400-ton crane and large stacking station.
-The EHV workshop has five areas. These are: coiling area, insulation processing area, core processing area, active part assembly area, and final assembly area. Their factory also boasts its modern EHV testing center where the transformers are tested to determine if they pass the customers' requirements and limits.

Factory Acceptance Test: Nantong Hyosung Transformer Co., Ltd.

Below is my report to our Human Resource Department for the Factory Acceptance Tests that I had witnessed at Nantong Hyosung, China. Specific details of the testing of power transformers will follow.

Title: FACTORY ACCEPTANCE TEST OF POWER TRANSFORMER
Venue: NO. 88 XIAOXING AVE, HAIAN DEVELOPMENT ZONE, JIANGSU, CHINA
Organizer: NANTONG HYOSUNG TRANSFORMER CO., LTD.
Date: JULY 29 - AUGUST 5, 2011