In my last post, I have recommended three action plans for Station Battery monitoring, namely replacement of the battery cells with low specific gravity,formulation of monitoring logbook for electrolyte level for station batteries, and Installation of ACU for Battery Room. So far, Airconditioning System and monitoring and topping-up of electrolyte level were implemented. We cannot replace the affected batteries since there are no spares left. The spare batteries of district one substation were all used when a cell of a battery bank exploded at a particular substation.
My personal notes and guide in operation and maintenance of power substation and high voltage equipment.
Disclaimer:
Caveat Lector: Although great care has been taken in the compilation of the information contained on this web site, the authors are not liable for the accuracy in terms of error or omission. The information on this web site is subject to change without notice and without obligation on the part of the authors. The authors shall not be liable for technical failures or for failures beyond their control. Some posts may contain authors' personal opinions and views and the authors do not represent any company, corporation or institution.
